Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

We have switched hosting. Sorry for the recent downtime. :)

Genesis Centre: Difference between revisions

From FireAlarmPedia
No edit summary
(ESTIII)
 
(6 intermediate revisions by 3 users not shown)
Line 5: Line 5:
|  
|  
|-
|-
| FACP: Edwards EST3 <br /> FACP Location: Unknown <br> System Type: Addressable <br /> System Line Voltage: 120VAC<br />NAC Voltage: 24VFWR <br /> System Coding: 20BPM (First Stage) <br> Temporal (GA) <br> Date of last known Upgrade: 2022 <br />Year Opened: 2012
|FACP: Edwards EST3 <br />FACP Location: Unknown <br>System Type: Two-Stage Addressable <br />System Line Voltage: 120VAC<br />NAC Voltage: 24VDC<br />System Coding: 20BPM (Alert) <br>Temporal (Alarm) <br>Strobes Synchronized: Yes, Self-sync<br> Date of last known Upgrade: 2022 <br />Year Opened: 2012
|}
|}
'''Genesis Centre''' is a multi-purpose complex located at 7555 Falconridge Boulevard Northeast #10, in Calgary, Alberta, Canada. The building houses the Saddletowne YMCA, several arenas, a swimming pool, several gymnasiums, as well as a field house. The building opened in 2012, and the fire alarm system is original with the exception of the main FACP.
'''Genesis Centre''' is a multi-purpose complex located at 7555 Falconridge Boulevard Northeast #10, in Calgary, Alberta, Canada. The building houses the Saddletowne YMCA, several arenas, a swimming pool, several gymnasiums, as well as a field house. The building opened in 2012, and was expanded in 2014. The fire alarm system is original with the exception of the main FACP.
== System Specifications ==
== System Specifications (2011-present) ==
==== FACP ====
==== FACP ====
The building is protected by an Edwards EST3 addressable fire alarm system. The panel location is unknown. The system runs Edwards' Signature-series addressable protocol, and is configured for two-stage operation. First stage coding is 20BPM, followed by temporal in general alarm. This panel replaced an EST QuickStart QS4.
The building is protected by an Edwards EST3 addressable fire alarm system. The panel location is unknown. The system runs Edwards' Signature addressable protocol, and is configured for two-stage operation. Alert signal coding is 20BPM, followed by temporal for the evacuation signal.  
 
This panel replaced the original EST QuickStart QS4 in 2022.
===== Annunciators =====
===== Annunciators =====
There is an Edwards EST3-6ANN annunciator in the main entrance vestibule.
There is an Edwards EST3-6ANN annunciator in the main entrance vestibule.
==== Notification Appliances ====
==== Notification Appliances ====
=====Feature Gym=====
=====Feature Gym=====
One wall has Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd). The other wall has Mircom BL-10B motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd).
One wall has Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd).  
 
The other wall has Mircom BL-10B motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd), as this was the area expanded in 2014.
=====All Other Areas=====
=====All Other Areas=====
All notification appliances but one are Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd). There is an Edwards 439D-10AWC vibrating bell (10" gong) on an Edwards 403-5A-R strobe plate (15cd) in the community gym, which is also original.
All notification appliances but one are Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd).  
 
There is an Edwards 439D-10AWC vibrating bell (10" gong) on an Edwards 403-5A-R strobe plate (15cd) in the community gym, which is also original and likely installed due to supply issues.
=== Initiating Devices ===
=== Initiating Devices ===
==== Pull Stations ====
==== Pull Stations ====
All pull stations are EST SIGA-270P addressable two-stage single-action pull stations. There are a few newer ones installed as deficiency replacements.
All pull stations are EST SIGA-270P addressable two-stage single-action pull stations. There are a few newer ones installed as deficiency replacements.
==== Automatic Detection Devices ====
==== Automatic Detection Devices ====
There are EST SIGA-PS addressable photoelectric smoke detectors in some areas, mounted on EST SIGA-SB bases.
There are EST SIGA-PS addressable photoelectric smoke detectors in some areas, such as the elevator lobbies, mounted on EST SIGA-SB bases.  
[[Category:Facilitie]
 
There is also a sprinkler system with waterflow detection.
==== Modules ====
There are EST SIGA-CT1 addressable monitor modules supervising the sprinkler system's tamper and flow switches. <br>There are EST SIGA-CR addressable relay modules serving various purposes.
 
====EOLs====
There are Edwards EOL-P1 end of line resistor plates on all sprinkler and signal circuits.
[[Category:Calgary]]
[[Category:Recreation Centres]]

Latest revision as of 11:19, 28 September 2024

System Specifications
FACP: Edwards EST3
FACP Location: Unknown
System Type: Two-Stage Addressable
System Line Voltage: 120VAC
NAC Voltage: 24VDC
System Coding: 20BPM (Alert)
Temporal (Alarm)
Strobes Synchronized: Yes, Self-sync
Date of last known Upgrade: 2022
Year Opened: 2012

Genesis Centre is a multi-purpose complex located at 7555 Falconridge Boulevard Northeast #10, in Calgary, Alberta, Canada. The building houses the Saddletowne YMCA, several arenas, a swimming pool, several gymnasiums, as well as a field house. The building opened in 2012, and was expanded in 2014. The fire alarm system is original with the exception of the main FACP.

System Specifications (2011-present)[edit | edit source]

FACP[edit | edit source]

The building is protected by an Edwards EST3 addressable fire alarm system. The panel location is unknown. The system runs Edwards' Signature addressable protocol, and is configured for two-stage operation. Alert signal coding is 20BPM, followed by temporal for the evacuation signal.

This panel replaced the original EST QuickStart QS4 in 2022.

Annunciators[edit | edit source]

There is an Edwards EST3-6ANN annunciator in the main entrance vestibule.

Notification Appliances[edit | edit source]

Feature Gym[edit | edit source]

One wall has Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd).

The other wall has Mircom BL-10B motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd), as this was the area expanded in 2014.

All Other Areas[edit | edit source]

All notification appliances but one are Edwards MB10-24 motor bells (10" gong) mounted on Edwards 403-5A-R strobe plates (15cd).

There is an Edwards 439D-10AWC vibrating bell (10" gong) on an Edwards 403-5A-R strobe plate (15cd) in the community gym, which is also original and likely installed due to supply issues.

Initiating Devices[edit | edit source]

Pull Stations[edit | edit source]

All pull stations are EST SIGA-270P addressable two-stage single-action pull stations. There are a few newer ones installed as deficiency replacements.

Automatic Detection Devices[edit | edit source]

There are EST SIGA-PS addressable photoelectric smoke detectors in some areas, such as the elevator lobbies, mounted on EST SIGA-SB bases.

There is also a sprinkler system with waterflow detection.

Modules[edit | edit source]

There are EST SIGA-CT1 addressable monitor modules supervising the sprinkler system's tamper and flow switches.
There are EST SIGA-CR addressable relay modules serving various purposes.

EOLs[edit | edit source]

There are Edwards EOL-P1 end of line resistor plates on all sprinkler and signal circuits.