More actions
mNo edit summary |
mNo edit summary |
||
Line 11: | Line 11: | ||
|} | |} | ||
'''The Approach Hotel''' is a hotel in Panorama Mountain Resort, BC that consists of two buildings. It is located at 2040 Summit Drive. This page will cover Building B, which houses Fireside Cafe & Lounge, and the fitness rooms and a spa. It was built in 1982 as Pine Inn North, and was renamed The Approach Hotel in 2022. The fire alarm system survived the renovations; the system was mostly installed in the late 1980s. | '''The Approach Hotel''' is a hotel in Panorama Mountain Resort, BC that consists of two buildings. It is located at 2040 Summit Drive. This page will cover Building B, which houses Fireside Cafe & Lounge, and the fitness rooms and a spa. It was built in 1982 as Pine Inn North, and was renamed The Approach Hotel in 2022. The fire alarm system survived the renovations; the system was mostly installed in the late 1980s. | ||
== System Specifications ( | == System Specifications (1980s-present) == | ||
==== FACP ==== | ==== FACP ==== | ||
The building is protected by a GE FireShield Plus FSP1004G onventional fire alarm system. The panel is located in the lobby and is equipped with the DACT. | The building is protected by a GE FireShield Plus FSP1004G onventional fire alarm system. The panel is located in the lobby and is equipped with the DACT. The system coding is likely temporal. | ||
The panel replaced an Edwards 2280 in 2011. | The panel replaced an Edwards 2280 in 2011. | ||
==== Notification Appliances ==== | ==== Notification Appliances ==== | ||
All notification appliances are Edwards 439D-10AWC vibrating bells (10" gong). | All notification appliances are Edwards 439D-10AWC vibrating bells (10" gong), installed in 1993. | ||
=== Initiating Devices === | === Initiating Devices === | ||
==== Pull Stations ==== | ==== Pull Stations ==== |
Revision as of 00:30, 4 April 2024
System Specifications |
---|
FACP: GE FireShield Plus FSP1004G
FACP Location: Lobby System Coding: Temporal? |
The Approach Hotel is a hotel in Panorama Mountain Resort, BC that consists of two buildings. It is located at 2040 Summit Drive. This page will cover Building B, which houses Fireside Cafe & Lounge, and the fitness rooms and a spa. It was built in 1982 as Pine Inn North, and was renamed The Approach Hotel in 2022. The fire alarm system survived the renovations; the system was mostly installed in the late 1980s.
System Specifications (1980s-present)
FACP
The building is protected by a GE FireShield Plus FSP1004G onventional fire alarm system. The panel is located in the lobby and is equipped with the DACT. The system coding is likely temporal.
The panel replaced an Edwards 2280 in 2011.
Notification Appliances
All notification appliances are Edwards 439D-10AWC vibrating bells (10" gong), installed in 1993.
Initiating Devices
Pull Stations
All pull stations are Edwards 270-SPO pull stations, installed in the late 80s (no FIRE ALARM, 270A font)
Automatic Detection Devices
All smoke detectors are Edwards 6250C ionization smoke detectors.
Some areas have Edwards 281C fixed-temperature/rate-of-rise heat detectors.