Toggle menu
Toggle personal menu
Not logged in
Your IP address will be publicly visible if you make any edits.

We have switched hosting. Sorry for the recent downtime. :)

Calgary Municipal Building: Difference between revisions

From FireAlarmPedia
mNo edit summary
No edit summary
Line 5: Line 5:
|  
|  
|-
|-
| FACP: Edwards EST3
| FACP: Edwards EST3 <br>FACP Location: Fire Control Room<br />System Type:Addressable<br /> System Line Voltage: 120VAC<br />NAC Voltage: 70.7VRMS (Audible) <br>24VDC (Visual) <br>System Coding: Unknown <br>Strobes Synchronized: Yes<br />Date of last known Upgrade: 2003<br />Year Opened: 1985
FACP Location: Fire Control Room<br />System Type:Addressable<br /> System Line Voltage: 120VAC<br />NAC Voltage: 70.7VRMS (Audible)
 
24VDC (Visual)
 
System Coding: Unknown
 
Strobes Synchronized: Yes<br />Date of last known Upgrade: 2003<br />Year Opened: 1985
|}
|}
'''Calgary Municipal Building''' (also known as New City Hall) is a large government building in Downtown Calgary. It is located at 800 MacLeod Trail SE, Alberta, Canada. It houses the offices for most city employees, the municipal council chamber, and several services, such as payment offices. The building opened in 1985, and had its fire alarm system upgraded in 2003.
'''Calgary Municipal Building''' (also known as New City Hall) is a large government building in Downtown Calgary. It is located at 800 MacLeod Trail SE, Alberta, Canada. It houses the offices for most city employees, the municipal council chamber, and several services, such as payment offices. The building opened in 1985, and had its fire alarm system upgraded in 2003.
Line 29: Line 22:
==== Modules ====
==== Modules ====
There are EST SIGA-CT1 addressable monitor modules supervising the sprinkler system's tamper and flow switches.
There are EST SIGA-CT1 addressable monitor modules supervising the sprinkler system's tamper and flow switches.
== Permits ==
== Permits ==
December 4, 2003 - New Fire Alarm System
December 4, 2003 - New Fire Alarm System
[[Category:Calgary]]
[[Category:Government Services]]

Revision as of 18:49, 23 May 2024

System Specifications
FACP: Edwards EST3
FACP Location: Fire Control Room
System Type:Addressable
System Line Voltage: 120VAC
NAC Voltage: 70.7VRMS (Audible)
24VDC (Visual)
System Coding: Unknown
Strobes Synchronized: Yes
Date of last known Upgrade: 2003
Year Opened: 1985

Calgary Municipal Building (also known as New City Hall) is a large government building in Downtown Calgary. It is located at 800 MacLeod Trail SE, Alberta, Canada. It houses the offices for most city employees, the municipal council chamber, and several services, such as payment offices. The building opened in 1985, and had its fire alarm system upgraded in 2003.

System Specifications (2003-present)

FACP

The building is protected by an Edwards EST3 addressable fire alarm system. The main panel is located in the fire control room, adjacent to the elevator lobby on the second floor. The system runs EST's Signature addressable protocol, and is equipped with voice evacuation. The system is configured for two-stage operation, however the messages and/or tones are unknown at this time.

Notification Appliances

Most notification appliances are Edwards 965-5A-8RW speaker/strobes (white, ceiling-mount, 8” driver, 15cd).

Some lower-traffic areas have Edwards 965-5A-4RW speaker/strobes (white, ceiling-mount, 4” driver, 15cd).

Initiating Devices

Pull Stations

All pull stations are EST SIGA-270P addressable two-stage single-action pull stations.

Automatic Detection Devices

There are EST SIGA-PS addressable photoelectric smoke detectors throughout the building, mounted on EST SIGA-SB bases.

Modules

There are EST SIGA-CT1 addressable monitor modules supervising the sprinkler system's tamper and flow switches.

Permits

December 4, 2003 - New Fire Alarm System